the podcast on

A $1.4 billion upgrade could be on the way for Transpower's Cook Strait electricity cable.
The 610 kilometre link is a transmission system connecting the North and South islands, installed in 1991.
The existing cables are likely to reach their end of life in the late 2030s.
Energy Resources Aotearoa CEO John Carnegie told Mike Hosking the Commerce Commission will need to review that.
He says they鈥檒l need to ensure the numbers are robust and the programme executable.
LISTEN ABOVE
Take your Radio, Podcasts and Music with you
Get the iHeart App
Get more of the radio, music and podcasts you love with the FREE iHeartRadio app. Scan the QR code to download now.
Download from the app stores
Stream unlimited music, thousands of radio stations and podcasts all in one app. iHeartRadio is easy to use and all FREE