Three groups of construction and infrastructure companies will be bidding to build the next section of the new Northland Expressway after the shortlist for the public-private partnership has been confirmed.
Transport Minister Chris Bishop today revealed the three consortia, selected by the NZ Transport Agency, would move on to the next step in the bidding process to build a 26-kilometre, four-lane expressway from Warkworth.
The shortlist is:
- Northway: Acciona Concesiones SL, abrdn Global Sustainable Infrastructure GP IV Ltd and Acciona Construction New Zealand Ltd
- Go>North: VINCI Highways SAS, John Laing Ltd, VINCI Construction Grands Projets SAS, VINCI Construction GeoInfrastructure SAS and HEB Construction Ltd
- Together North: Plenary Origination Pty Ltd, Webuild SpA, WBCA Pty Ltd, Gamuda Engineering Pty Limited and Service Stream Holdings Pty Limited
The consortia would now submit proposals for the financing, design, construction, management and maintenance of this section of the expressway.
A preferred bidder was expected to be chosen in early 2026, a contract finalised in mid-2026 and early construction work to begin in late 2026.
The Warkworth to Te Hana section would connect to the new P奴hoi to Warkworth expressway with initial designs including an 850m-long, twin-bore tunnel in the Dome Valley and three interchanges located at Warkworth, Wellsford and Te Hana.
The road, once fully complete, was estimated to be one of New Zealand鈥檚 most expensive infrastructure projects, with the Infrastructure Commission estimating the project would consume one dollar in every 10 spent by the Government on infrastructure over the next 25 years 鈥 excluding maintenance and renewals.
Northland Regional Transport Committee chairman Joe Carr, Whang膩rei MP Dr Shane Reti, Transport Minister Chris Bishop and Northland MP Grant McCallum talk about the preferred route for the Northland Expressway. Photo / Dean Purcell
Bishop, also the Infrastructure Minister, announced the Government was seeking expressions of interest at its Investment Summit in March.
鈥淲e received very strong interest in this project from both domestic and international consortia, several of which included companies who attended the Investment Summit,鈥 he said.
鈥淭he shortlisted consortia are all well-positioned to deliver a high-quality motorway that will boost regional resilience, enhance road safety and travel reliability and strengthen vital connections for freight, tourism and everyday drivers.鈥
Guido Cacciaguerra, the Australia-based head of PPPs for Italian Webuild, a multinational industrial group specialising in construction and civil engineering, had confirmed his company would bid for the PPP at March鈥檚 summit.
Cacciaguerra said his firm has a long history in New Zealand. Codelfa-Cogefar, a predecessor firm to Webuild, helped construct tunnels for the Tongariro hydro scheme in the 1960s.
鈥淭he Italians are coming back,鈥 he told media at the summit.
鈥淓very time there was a new deadline, that was met.
鈥淭he Northland Corridor is happening, it鈥檚 real 鈥 I work with governments around the world and it is very rare to see every time a deadline that is met by the government side."
Cacciaguerra said his investment, 鈥渋n terms of debt鈥 would be 鈥渂illions鈥, and 鈥渋n terms of equity, hundreds of millions鈥.
Adam Pearse is the Deputy Political Editor and part of the NZ Herald鈥檚 Press Gallery team based at Parliament in Wellington. He has worked for 九一星空无限 since 2018, reporting for the Northern Advocate in Whang膩rei and the Herald in Auckland.
Take your Radio, Podcasts and Music with you
Get the iHeart App
Get more of the radio, music and podcasts you love with the FREE iHeartRadio app. Scan the QR code to download now.
Download from the app stores
Stream unlimited music, thousands of radio stations and podcasts all in one app. iHeartRadio is easy to use and all FREE